Выбрать главу

“I’m sure you will, Augustus, I’m sure you will.” She then referred to the person behind him. “Shackle him, Khan.” She picked up the croatoan pistol and aimed it at Augustus’ head as this Khan person let go of his hands and picked up the shackles. “You move an inch, and I won’t hesitate for a moment to deprive Unity of seeing the last Roman in action. You understand me?”

“Perfectly.”

Khan, a dark-eyed, passive-faced man, stepped round to face Augustus, but didn’t look up at him. He bent down and began to place the shackles around Augustus’ ankles. The thought of kicking the young man in the face crossed his mind, but he knew Aimee would kill him there and then if he tried.

He’d seen that focused look on her face before—at the arena. Despite her appearances to the contrary, she was as bloodthirsty as any warlord Augustus had met, including those in the croatoan council during the uprising.

You’d look at the remaining aliens now and wonder how they took over the planet so quickly. Meek and bred to follow orders, they had little agency or thoughts of their own, but the combat species were an entirely different beast.

They travelled from planet to planet, wiping out resistances and laying the groundwork for a council-controlled mother ship to oversee the farming and terraforming.

Compared to them, Khan and Aimee were sickly kittens.

But even a sickly kitten with a weapon was something to be wary of.

“I assume I’ll be facing Baliska in the arena?” Augustus said as he shuffled slightly, making sure Khan couldn’t yet attach the shackles. A noise from outside had caught Augustus’ ear—a brief sound of struggle and the squeak of a rusted hinge. From Aimee’s position near her crackling fire, it didn’t seem as if she had heard it, and Khan was too busy trying to work out how the arcane mechanism of the shackles worked.

“Stay still,” Aimee said, stepping forward. “And yes, you’ll be facing Baliska… among others.”

Augustus smiled. “Not a fair fight, then?”

“You don’t deserve one.”

“That makes two of us.”

“A little late for threats,” Aimee said.

Khan finally unlocked the shackles and placed the iron rings over Augustus’ left ankle. Augustus kicked out, catching the young man in the throat and knocking him over as the former emperor dived to his right.

The door to Aimee’s room burst open. Gregor and three human thugs piled in, catching Aimee off guard. Her shot went high and wide. Gregor saw Khan on the floor with the shackles.

“Kill him!” Augustus screamed. Gregor raised his croatoan-made rifle and fired once into Khan’s ribs, sending him flat against the floor with a screech. Before Aimee could recover, the thugs had pulled their pistols—a combination of croatoan and human weapons—and pointed them at the Unity leader.

Gregor stepped forward, looked around to assess the situation, and spoke to Augustus. “I talked with your little helper at the ludus. Thought you might need a hand.”

For a moment, Augustus believed the ex-farm manager would see this as an opportunity to seize power for himself and rid this world of Augustus, but he turned back to Aimee, ignoring the emperor.

He stepped forward. Aimee stepped back. She looked over his shoulder. At first, Augustus, from his position to the right-hand side of the room, thought she was simply looking at Khan or the three thugs, but a large shadow entered, quickly followed by the bulky, threatening shape of Baliska.

The large hunter drove his sword into the first thug’s back, killing him instantly. His mate next to him turned only to have a dagger thrust into his throat. He fell to the ground, gurgling.

Gregor and the remaining thug turned and fired, but Baliska was already on the move, ducking and rolling down the left side of the room. As he came back up to his feet, he pulled an angular croatoan pistol from a compartment in his black armor and fired twice. The remaining thug’s head snapped back on the first shot and broke apart on the second.

Gregor fired twice. The first directed at Aimee, the second at Baliska. Aimee twitched out of the way, just missing the shot, but she dropped her pistol to the ground between her and Gregor.

Augustus considered trying to make a grab for it, but when Baliska launched himself at Gregor, knocking the rifle from his hands and driving him down to the floor, Augustus climbed to his feet and snuck out the door as the melee continued and all attention was on the fight in the now-crowded room.

Once he slipped outside, he took a quick look back.

Aimee dodged Gregor’s thrashing legs as she tried to wrestle free of the large croatoan. She slipped and fell to the ground, cracking her head against the corner of her bed. Baliska reared up and delivered two mighty punches to Gregor’s chest, knocking the fight out of him.

Before they realized he had left, Augustus sprinted down the short corridor to the dining hall and turned right into a small archway that led to a tunnel he knew would take him out through the back of the stronghold.

The sound of rushing feet from a steel staircase on the other side of the dining room told him those guarding the ramparts had heard the commotion and were now on their way to deal with the aftermath.

Augustus made sure he wouldn’t be around when they arrived.

Through the twisting tunnel he ran, dodging low as the access became ever tighter. Eventually, scraping through, he kicked open a wooden covering and opened the iron gate. He stepped out into the morning air. The smell of roasting bacon and the sounds of the town waking up gave him the cover to sprint to the steps at the rear of the basin.

With no guards on the ramparts, and unable to be seen by the observation towers due to being blocked by the stronghold, Augustus commandeered Aimee’s personal hover-bike and sped off deep into the canopy.

There would be no arena fighting for him. No more diplomacy or patience.

There would be only war.

He would retreat for now, regroup, and return with force to take Unity for himself under his sole rule.

He’d put Aimee’s head on a pike first as a warning to others.

* * *

Gregor coughed up blood and squirmed beneath Baliska’s great bulk. The alien sat back onto his gut, pinning him in place. It snarled at Gregor, exposing its teeth. Aimee had found a pistol and was checking on Khan. Gregor knew his time was coming to an end.

With Augustus abandoning him—even though Gregor had taken a risk to come here—he knew he had but one option left.

“I give up,” Gregor said, relaxing. “I submit, or whatever it is you lot understand. I’m done; it’s over. I’m in your custody.”

Baliska growled at him and grabbed his throat with one of its massive paws. Aimee appeared by the alien’s side and placed a hand on its shoulders. “It’s okay,” she said. Let him live—for now. We have bigger things to worry about.”

She turned to a group of four aliens who’d rushed in. “Augustus has escaped; we need to find him. I want you to split up, organize two scouting parties. Go. Make sure he’s found. Use deadly force if you have to. I’m tired of taking the slow approach with him.”

Baliska eased the pressure on Gregor’s throat and stood up, turning to Aimee for directions. Gregor, anticipating such a move, grabbed the syringes of poison from a protective case in his pocket, and jabbed through the tough scaly hide of the alien, plunging the full complement of poison into the damned thing’s bloodstream.

The alien howled and bent its head back. It extended its arms as its muscles began to contract against its will. But then it seemed to gain control. It bent down and lifted Gregor by the throat, squeezing his windpipe, making him choke.

Kicking with everything he had, Gregor started to panic. Had Augustus tricked him? Was the poison ineffective? Had he known this and hoped Gregor would die at Hagellan’s hands?